We built a 16' x 16' addition and then added a 16 x 20 deck on one side and a 16 x 13 on the other with a catwalk connecting both, The deck on the left side of the addition has a three season dry area below with a rain gutter system built in
Photo Albums for Nicholas Feely Construction
Trex Deck
Trex Decking, Treehouse with Vintage Lantern Accent, White sleeve posts and Vintage Lantern Rails, LED Accent Lighting
Trex Deck in Island Mist
New 12 x 16 Deck with Trex Tropical Island Mist Decking, White Slleves and Black Rails. LED Accent Lighting
Plymouth basement, additi
Complete Basement finish. addition and deck
Wilson Ave. Remodel
Complete Home Remodel including new Kitchen, Bathroom, Windows, Basement Finish, Siding, Sod, concrete flat work, roofing flooring, doors and paint
Elk River Home
Another remediation Job
Coon Rapids Mold job
This project was a complete mold remediation as there was in floor heat that had frozen in the basement and property sat for two years sealed up so mold exploded throughout the house. every piece of drywall and insulation was replaced due to mold contamination. New kitchen, bathrooms, furnace, water heater, flooring, drywall, paint, doors trim etc.